Thursday, February 11

My Cart

10:30 AM – 11:30 AM

T301

The other 8,700 hours: rethinking backup heating for air-source heat pump systems

Location: Rooms 218/219

  • Architecture
  • Construction & Trades
  • Engineering

Streams: Sustainability, Decarbonization & High-Performance Buildings

Building Types: Commercial, Institutional, Mixed-Use, Residential: Multi-Unit, Residential: Single-Unit

Partners: Building to Electrification (B2E)

Air-source heat pumps are increasingly viewed as a cornerstone of building electrification and decarbonization. However, as outdoor temperatures fall, both heating capacity and efficiency decline, often requiring supplemental heat during the coldest hours of the year. This session reframes the design question. Rather than asking whether a heat pump can meet every hour of a building’s heating demand, it asks how much of the year it can operate efficiently and what the most practical strategy is for the remaining hours. Using the concept of the “other 8,700 hours,” the presentation explores how a small number of extreme-weather hours can drive disproportionate cost and system complexity. Through practical examples, the session compares backup heating options, including gas-fired, hybrid, and electric resistance systems. Particular attention is given to the counterintuitive idea that the least efficient heating technology may sometimes be the most practical backup solution.

Speakers

Andrej Simjanov High-Performance Buildings, Remedy Engineering

Andrej Simjanov, P.Eng., is part of the High-Performance Buildings team at Remedy Engineering, where he works on mechanical systems design, energy modelling, commissioning, integrated systems testing, and building performance optimization. His work focuses on helping commercial and institutional buildings perform as intended, with a particular emphasis on practical low-carbon design, HVAC system integration, operational performance, and the gap between design intent and real-world operation. Andrej brings a balanced, evidence-based perspective to building decarbonization, combining technical analysis with an understanding of cost, constructability, controls, commissioning, and long-term operation.

Sorry, no results found.

Check the spelling, use fewer parameters, or look up a specific speaker.

Check the spelling, or look up a specific speaker.

Try using fewer parameters.